Dec. 4, 2017

Nashville Post: ‘Modifications to BNA require a great deal of work’

Achieving the sense of openness through the center of the terminal and creating a view corridor from the curbside to the aircraft and airfield beyond. The BNA Vision design requires a portion of the existing roof to be removed and replaced with the airwave form presented in the schematic design renderings.

Read more from the Nashville Post. 

Having served 16 million passengers in 2018, Nashville International Airport (BNA) is one of the fastest growing airports in North America. BNA serves 540 daily flights to more than 70 nonstop destinations. With a $7.1 billion total economic impact, BNA is the 33rd busiest airport in the U.S. BNA receives no local tax dollars. For more information, visit flynashville.com. Follow us on Facebook: @NashvilleInternationalAirport, Twitter: @Fly_Nashville and Instagram: @FlyNashville.

More News: