Jun. 23, 2020

Video: Terminal Garage 1 is Here and Waiting for You

Click to watch video

Terminal Garage 1 is the latest BNA Vision project to come online, adding convenience and more parking capacity.

Quick facts:

  • 6 levels (1-4 open now; 5-6 opening in early 2021)
  • New and improved Valet center and dedicated entrance
  • 2,000 public parking spaces (with 800 more coming in early 2021)
  • Customer conveniences including:
    • dedicated Valet customer entrance
    • double helix ramp system for easy access to parking levels
    • electric vehicle charging stations
    • tire inflation station
    • vehicle locator kiosks
    • pay-on-foot kiosks
    • flight information displays
    • eight public elevators
    • accent exterior lighting, programmable in a variety of colors and themes
  • 224 million pounds of concrete
  • 1,500+ workers
  • 807,000+ hours of labor
  • 93% local workforce
  • $41 million in contracts for small, minority and woman-owned business enterprises (SMWBEs)
  • Designed, built and operates utilizing Parksmart, utilizing Parksmartâ„ , the world’s only rating system designed to advance sustainable mobility through smarter parking structure design and operation.
  • Designed by Moody Nolan
  • Built by Messer Construction

With nearly 18.3 million passengers in 2019, Nashville International Airport (BNA) has been one of the fastest growing airports in North America. According to a recent study, in 2018 alone, BNA generated more than $7.1 billion in total economic impact, supported more than 67,000 jobs in the region, and produced more than $392 million in state, local and federal taxes. BNA receives no local tax dollars. For more information, visit flynashville.com. Follow us on Facebook: @NashvilleInternationalAirport, Twitter: @Fly_Nashville and Instagram: @FlyNashville.

More News: