Dec. 5, 2018

Important Parking Updates

Effective at midnight on Thursday, Dec. 20:

  • BNA’s new Terminal Garage will become operational. Terminal garage parking and ground transportation pick-up will relocate to the new Terminal Garage.
  • The Short Term Parking Garage entrance will permanently close on Dec. 20. The exit will remain open until Jan 6, 2019.
  • The names of several BNA parking lots will change. Rates are not changing.
    • Long Term A will be renamed Terminal Lot A
    • Long Term B will be renamed Economy Lot B
    • Economy will be renamed Economy Lot C
  • The pedestrian walkway between Long Term A (soon to be “Terminal Lot A”) and the Terminal will close on Jan. 6 at 11:59 p.m., due to construction. Please use BNA’s FREE shuttle to/from the Terminal.

About Nashville International Airport®

As infrastructure critical to the region’s growth and prosperity, BNA is a vital asset for Middle Tennessee and serves as a gateway to Music City and beyond. According to a recent State of Tennessee study, in 2019 alone, BNA generated more than $9.9 billion total economic impact.  BNA supported more than 76,000 jobs in the region and produced more than $443 million in state, local and federal taxes. BNA receives no local tax dollars.

NASHVILLE INTERNATIONAL AIRPORT®, ®, COMMANDER BERRY FIELD®, JOHN C. TUNE AIRPORT®, and JWN®, among others, are the registered trademarks and trademarks of The Metropolitan Nashville Airport Authority (“MNAA”). Use of these trademarks without permission from MNAA is strictly prohibited.

More News: